Four Sea Ltd
sales@reducersgearboxes.com
Home      News     Industry-news       Steps for Replacing and Installation Pre…

Industry-news

Steps for Replacing and Installation Precautions of TP Series Gearbox Bearings

Prepare tools and materials

Special tools: bearing tensioner, copper rod, dial gauge, plug gauge, torque wrench, gasket thickness gauge

Consumables: Original bearings of the same model, NLGI 2nd grade extreme pressure lithium grease, L-CKD 220 # extreme pressure gear oil, waterless cleaning agent, new skeleton oil seal, corresponding thickness adjustment gasket

3、 TP series reducer bearing replacement steps

1. Disassembly and pre-processing

Disconnect the input/output coupling, lift the gearbox from the base to the dedicated workbench, clean the oil stains on the casing, mark the original assembly positions of each end cover and gasket to avoid misalignment during reassembly.

2. Dismantling of old bearings

First, remove the end caps of the bearings at both ends, and use a bearing puller to hook the outer ring of the bearing and evenly apply force to pull it out. It is forbidden to directly strike the shaft body; If the bearing is rusted, the inner ring of the bearing can be locally heated to 80-100 ℃ and quickly pulled out while hot to avoid deformation of the shaft neck during annealing.

3. Axis and seat hole verification

Clean the journal and bearing seat holes, check that the mating surfaces are free of burrs and wear, the journal runout is ≤ 0.01mm, and the seat holes are free of cracks and deformations; If the journal wear exceeds 0.02mm, it needs to be repaired by brushing and plating before assembly.

4. Installation of new bearings

Place the new bearing in lubricating oil at 80-100 ℃ and heat it at a constant temperature for 10 minutes in advance. Quickly insert it into the shaft shoulder positioning while it is hot. Use a copper rod to cushion the inner ring of the bearing and evenly tap and press it into place. It is strictly prohibited to strike the outer ring to cause damage to the raceway.

5. Precise gap adjustment

Install the bearing end cover and adjust the shims between the end cover and the housing to control the axial clearance of the worm shaft bearing at 0.01~0.02mm and the output end bearing at 0.02~0.08mm. There should be no jamming during the entire rotation of the shaft body.

6. Reinstall and trial operation

Reset all seals, end caps, and connectors according to the markings, add the specified brand of lubricating oil, manually turn the disc for 3 turns to confirm there is no blockage, run it without load for 30 minutes, monitor the bearing temperature rise to ≤ 35 ℃ and no abnormal noise, and then gradually load it to the rated working condition.

CATEGORIES

CONTACT US

  Name: Hu Bo

  phone:+8618881888393

  Whatsapp:+8618881888393

  Email:sales@reducersgearboxes.com

  Add:No. 10 Xiyuan Road, Hangzhou City, Zhejiang Province, China

whatsapp

Skype

Email

Phone

Leave a message