  • 26-01-13
    To determine whether the installation coaxiality of the NGW-L61-5.6 planetary gearbox meets the requirements, static inspection and dynamic trial operation verification are required to ensure that the coaxiality deviation between the input shaft and the motor shaft, and the output shaft and the load shaft is within the allowable range. Here are the specific methods: 1、 Static inspection: Verify
  • 26-01-09
    The daily maintenance points for the FF97-Y22KW-4.12 reducer after installation should revolve around five core areas: lubrication, cleaning, inspection, fastening, and environment. The specific steps are as follows, which can be directly implemented: 1. Lubrication system maintenance Add lubricating oil of the appropriate brand according to the instructions, replace it with new oil after th
  • 26-01-09
    To determine whether the installation reference surface of FF78-Y4-4P-21.43-M1 reducer is flat, a method of tool inspection and fitting verification should be used, with precise steps that can be directly operated: 1. Prepare testing tools Select a frame level with an accuracy level of ≥ 0.02mm/m, a feeler gauge with an accuracy of 0.02mm, and a clean ruler (with a length not less than the d
  • 26-01-08
    Check whether the internal gear transmission system of CJY180-63-3KW reducer is normal, combined with static inspection during shutdown and dynamic monitoring during operation. If necessary, disassemble and inspect the machine. The specific steps and judgment criteria are as follows: 1、 Static inspection during shutdown (no need to disassemble, quick initial judgment) 1. Appearance and seali
  • 26-01-08
    The key to determining whether the CJY112-250-1.2KW shaft mounted reducer requires additional maintenance depends on the working conditions and status. The following is the specific method of judgment: 1、 Additional maintenance judgment under special working conditions Heavy load/impact load conditions (such as metallurgical and mining equipment): Lubricating oil replacement cycle: If the e
  • 26-01-07
    When installing the FAF37-0.75KW-8.2 reducer, common errors and corresponding precautions are as follows: 1. Coaxiality out of tolerance installation: Failure to calibrate the coaxiality between the motor and gearbox, as well as between the gearbox and the load, using a dial gauge resulted in forced coupling, causing the coupling to be biased, leading to bearing overheating and increased gear w
  • 26-01-07
    To determine whether the installation reference surface of FF78-Y4-4P-21.43-M1 reducer is flat, a method of tool inspection and fitting verification should be used, with precise steps that can be directly operated: 1. Prepare testing tools Select a frame level with an accuracy level of ≥ 0.02mm/m, a feeler gauge with an accuracy of 0.02mm, and a clean ruler (with a length not less than the d
  • 26-01-06
    When adjusting the ZLY224-12.5-1 reducer gasket, it is important to pay attention to the following safety and operational points: 1、 Core principles of gasket adjustment Thickness matching: The thickness of the gasket needs to be adapted to the gear mesh clearance. When the wear is light, only adjust the thickness of S1. When the wear is heavy, adjust S1/S2 (driven gear side) and S3/S4 (drivin
  • 26-01-06
    The WPS60-20-A gearbox has high oil temperature due to excessive load, which can be systematically solved through the following steps: 1、 Core solutions 1. Adjust the load immediately Check if the motor current exceeds 110% of the rated value. If it is overloaded, optimize the production process or reduce the load. Avoid frequent starting and stopping (≤ 5 times per hour) to reduce imp
... 1112131415 ...

CATEGORIES

LATEST NEWS

CONTACT US

  Name: Hu Bo

  phone:

  Whatsapp:+8618881888393

  Email:supplychainalliance.cn@gmail.com

  Add:No. 10 Xiyuan Road, Hangzhou City, Zhejiang Province, China

whatsapp

Skype

Email

Leave a message